Cobra North and Khan West

Cobra north and Khan West Project Highlights:

Historical Uranium Deposit and Mining Licence

2015 SRK Engineering prepared JORC Compliant Resource of 9,000,000 lbs expandable

SRK has generated tonnage and grade estimates for the mineralisation demonstrated to be present by exploration to date on the two drilled areas of EPL3524 and 3624. In total this drilling has outlined over 15Mlb of U3O8. In SRK’s opinion, some 9Mlb of this mineralisation has already been demonstrated to be potentially economic to exploit and is supported by enough data, and is sufficiently well delineated, to be reported as an Inferred Mineral Resource as defined by the JORC Code.

RK Mineral Resource Estimate

NOTE: Though the mineral resource estimate was prepared using Modern era (2015) methodology. Dark Star’s management considers the MRE to be historical in nature and should not be relied upon. Dark Star plans to have the report updated and republished. The Project is currently under LOI as announced on June X. See Release here.
Husab Mine & Processing Facility – Third Largest Uranium Deposit in the World.
Drillhole ID Depth (metre) Sample ID Head grade
(U3O8 ppm)
Recovery % Acid consumption
(kg/t)
Nb (ppm) Ta (ppm)
RC003 144-145 F5124 360.6 82.00 14.21 8.8 <5
RC005 61-64 F5125 562.7 86.60 2.45 17.2 <5
RC005 115-116 F5126 567 77.10 4.41 14.1 <5

Download Investor deck